Spring Fellowship Work Projects 2024

The following are lists of adult and specialty work projects that have been identified by the service team at Camp Rainey Mountain for Spring Fellowship. If you would like to work on a specific project please contact Alex Sutter (lodge.chief@mowogo.org) or Lane Bridges (vigil.adviser@mowogo.org). Youth clan projects will be administered by the Lodge Service Chair and communicated directly to Elangomats as part of their Clan assignments.

 

Suggested Work Projects for Adult or Adult Clans

  • Cook’s Cabin
    • Clean off back deck and clean gutters
  • Camp Wide Gutter Cleaning Clan - Adult Clan Only- Gutter and roof cleaning Team for Entire Camp This Team should be made up of adults over 21 Bathhouse in Area A and on to Trading Post and Cooks Cabin and go around loop and check out all Pit toilet roofs and all Adirondack roofs and shower house roofs including the Nature Lodge and around the loop to all campsites and on to the Dining Hall and completing at the Administrative Building
  • Split wood
  • Paint red lines on rifle range
  • Load trees into dump trailer to get hauled out of main part of camp
  • Prune back limbs around tents and cabins
  • Help with tent platform leveling
  • Paint signs in camp
  • Remove old steps in lower bridges

Special Projects

  • Electrical (Jeff Lee)
  • Tent platform repair/ construction
  • Leveling tent platforms
  • Replace lower 3ft of siding beaver shelter
  • Replace lower 3ft of siding cabins Bridges
  • Cover waterfront A buddy tag board roof with metal
  • COPE repairs (Ed Brown)
  • Low cope stairs (Ed Brown)
  • Finish staff cabins (Jason S. Mark P.)
  • New picnic tables built
  • Replace/ repair benches at chapel in the woods
  • Build steps in lower bridges
  • High Course Shelter (Mark White)

 

A PDF copy of the Spring Fellowship project list can be downloaded from the link below. The PDF version contains lists of both Youth and Adult projects.